On the morning of November 8th, the Hue City Civil Defense Command announced that it had issued an order to regulate the operation of the Ta Trach reservoir and the A Luoi and A Lin B1 hydropower plants (A Lin 3 - A Lin B1 reservoir cluster) to release water from the reservoirs to ensure the safety of the structures and downstream areas before and during the prolonged heavy rain from November 8th to 12th.